Additional diamonds recovered from lower level gravels at Save River Diamond Project, Mozambique
Highlights:
- Excavation of initial trial pits at Save River Diamond Project has resulted in further diamond recoveries after breaking through a hard calcrete layer below surface deposits comprising Rooikoppie alluvial gravels
- To date, a total of 38 diamonds have been recovered from multiple layers across the project area totalling 23.70 carats
- Latest recoveries further validate existence of gem-quality diamonds
- Upgraded diamond recovery plant fully commissioned and operating at 1,000m3/day
- RC drill rig to be mobilised to site shortly to accelerate definition of paleo channels & sampling targets – targeting JORC compliant Mineral Resource
- Further recoveries expected as bulk sampling work continues from Rooikoppie and localised underlying gravel deposits
To view Update please download PDF attached: