Highlights:
- A 2.6 carat gem quality diamond was recovered from ongoing near surface (<3.5 metre) bulk-sampling activities
- Surface bulk sampling continuing with preparations being made for larger volume bulk sampling targeting deeper gravels
- All required equipment acquired for 1,000 tonne per day bulk sampling operation
- Major items already being mobilised to site.
Mustang Resources Limited,
(ASX:MUS) (“Mustang” or the “Company”) is pleased to provide an update on exploration activities on its Save River Diamond Project, located in southern Mozambique.
For further information please download PDF attached: