Barabolar Project
Silver Mines Limited (ASX:SVL) (“Silver Mines” or “the Company”) is pleased to advise that it has now fully integrated all available datasets to prioritise drilling on the Barabolar Project. All targets have been developed through the combination of the recent acquired Induced Polarisation (IP) geophysical data with recent remodelling of airborne magnetic data and the Company’s geochemical and geological modelling. As a result of this work, the Company has designed its drill hole locations across multiple targets at the Barabolar Project. The Company is aiming to conduct a 30 hole program with reverse circulation and diamond core drilling for approximately 7500 metres (subject to approvals).
Please refer press-releases dated 24 August 2018, 16 August 2018, 19 July 2018, 26 June 2018 and 14 December 2017 for further details.
For further information please download PDF attached:
Download this document