Key points
- 28 wells drilled of 30 wells planned for FY14, with 25 cased and suspended for further testing and production.
- Two wells cased and suspended on the western flank as future Birkhead oil producers:
Spitfire-3 appraisal well intersected 6.1 metres of net pay;
Spitfire-6 development well intersected 8.9 metres of net pay.
- Mustang-3 – the second well to be drilled in PPL 243 – plugged and abandoned after intersecting a well developed sand reservoir low to prognosis below the field oil-water contact.
- Updip of Mustang-3, drilling is underway on the Mustang-2 appraisal well.
For further information please download PDF attached: