KEY POINTS
- Work completed at the “Kakozhi” prospect (previously referred to as “Target A”) yielding encouraging results and supporting the case for further work
- Orion three-dimensional Induced Polarisation and Magnetotellurics (Orion 3D) survey to commence over high-grade area at Kitumba, with potential to be extended to other areas within the Mumbwa project
- JORC compliant resource update expected end June 2012 with results to be fed in Kitumba scoping study to be delivered by early August 2012
- Drilling expected to recommence July 2012 at Kitumba and Kakozhi
Blackthorn Resources Limited (ASX:BTR) (“the Company” or “Blackthorn Resources”) is pleased to provide the following update for the Mumbwa project area in Zambia.
The Mumbwa project is 100% Blackthorn Resources owned and hosts the flagship Kitumba prospect. The Project is located approximately 200km west from the capital Lusaka within a highly prospective greenfield play with giant IOCG (Iron Oxide Copper Gold) resource potential.