Media ReleasesRobust Resources

View All Robust Resources News


Robust Resources Ltd, Drill Results Position Robust for Gold-Silver Oxide Resource Expansion at Romang Island

-  Evidence of continuity of mineralisation between Batu Hitam and Batu Hitam West JORC resource models

-  Ongoing potential for further expansion of gold-silver oxide resource

-  Oxide Project Scoping Study nears completion.

Robust Resources Limited (‘Robust’ or ‘the Company’) is pleased to report assay results from drilling at the Batu Hitam West project on Romang Island, Indonesia. Of the 21 diamond drill holes completed, twenty intersected mineralisation of potential economic interest, maintaining the Company’s + 90% exploration success rate.

In line with the Company’s strategy of optimising its capital and resource interests by advancing the near-term development of an oxide gold-silver heap leach mining operation on Romang Island, much of the drilling announced today was at shallow depth and several holes ended in mineralisation.

Many of the holes intersected wide intervals of mineralisation, including sub- intersections with higher grades, which serves to demonstrate that significant potential exists outside of the previously reported JORC resource areas.


For further information please download PDF below:

Download this document

Subscribe to our Daily Newsletter?

Would you like to receive our daily news to your inbox?