Media ReleasesBlackthorn Resources

View All Blackthorn Resources News


Blackthorn Resources, Mumbwa Project: From Kitumba Phase 6 Drilling More High-Grade Results

KEY POINTS

- Assays have been received for drill holes KITDD_006 and KITDD_007.

- Mineralisation started from 55m with the following best copper intersections identified:
KITDD_006 (azimuth 090, dip -65, EOH 725.36m)
175m at 2.03% Cu from 230m to 405m, including - 11m at 4.2% from 245m to 256m - 28m at 4.1% from 310m to 338m.

- The collar of hole KITDD_006 is located approximately 225m to the north-west of the collar of hole S36_033.

- The deposit appears to be bounded by the Mumbwa Fault Zone to the east and is now closed off by KITDD_007 and earlier Phase 6 drill holes.

- The deposit is still open to the west, south and at depth. Further step-out holes are now being drilled from the west and underneath the deposit.

- Four drill rigs operating on site have completed 17 holes for 10,102m.

Blackthorn Resources Limited (ASX:BTR) (“the Company” or “Blackthorn Resources”) is pleased to provide assay results for drill holes KITDD_006 and KITDD_007.


For further information please download PDF below:

Download this document

Subscribe to our Daily Newsletter?

Would you like to receive our daily news to your inbox?