Windlab Limited (ASX:WND) has been advised by the EPC contractor to Kennedy Energy Park, a joint venture between Vestas Wind Systems and Quanta Services, that it has not been able to deliver a fully functioning generator performance standard model in the timeframes of the previously revised delivery schedule and is now not expected to do so until December 2019. Delivery of a fully functioning, compliant GPS model is the responsibility of the EPC contractor under the EPC contract.
For more information, download the attached PDF.
Download this document