Media ReleasesAltech Chemicals

View All Altech Chemicals News


Altech Announces HPA Plant Site Layout and Building Design Finalised

Highlights

• HPA plant site layout and buildings design finalised
• Incorporates results from geotechnical ground survey
• Construction development order application
• Stage 1 construction to commence

Altech Chemicals Limited (Altech/the Company) (ASX:ATC) (FRA:A3Y) is pleased to announce that it has now finalised and “locked” the site layout and building design for its proposed Malaysian high purity alumina (HPA) plant. The final layout and design incorporates results from the recently completed site geotechnical survey and feedback from pre-construction consultation meetings between SMS group GmbH (appointed EPC contractor), local authorities, and Malaysian permitting consultant WKL & Associates. The final design is the basis for the submission of a development order application and the commencement of stage 1 construction.


For further information please download PDF attached:
Download this document