Media ReleasesAltech Chemicals

View All Altech Chemicals News


Altech Announces Geotech Survey at Johor HPA Site Well Advanced

Highlights

• Geotechnical ground survey program well advanced

• Site topography, soil stability and soil analysis required for final design confirmation

• Part of Stage 1 construction works

Altech Chemicals Limited (Altech/the Company) (ASX:ATC) (FRA:A3Y) is pleased to advise that a geotechnical ground drilling and survey program that commenced in mid-August 2018 at the site of its proposed high purity alumina (HPA) plant in Johor, Malaysia is well advanced and nearing completion.

The detailed geotechnical survey is part of HPA plant Stage 1 construction activities. The works include an assessment of soil types, soil stability and a detailed assessment of site topography; each being required to confirm the HPA final plant’s civil engineering design. A full analysis of the site soil profile will be used to confirm the final foundation piling requirements.


For further information please download PDF attached:
Download this document