Media ReleasesCoppermoly Limited

View All Coppermoly Limited News


DEEP DRILLING AT SIMUKU CONTINUES TO EXPAND THE SIZE OF THE SYSTEM WITH 1,001.9 METRES OF 0.24% COPPER AND 60 PPM MOLYBDENUM

Final assay results for BWNBDD0014 between 804 and 904m depth have been received with 1,001.9 metres grading 0.24% copper and 60 ppm molybdenum and 2.38 g/t silver at the Tobarum Prospect.


For further information please download PDF below:

Download this document

Subscribe to our Daily Newsletter?

Would you like to receive our daily news to your inbox?