Media ReleasesLithium Power International

View All Lithium Power International News


Lithium Power International Announces Low Cost, Short Payback Outcomes in Preliminary Economic Assessment (PEA) for Maricunga Lithium Brine Project

Highlights

- The Maricunga Lithium Brine project’s Preliminary Economic Assessment (PEA) supports 20,000 tonnes per annum (t/a) production of lithium carbonate (LCE) and 74,000t/a potassium chloride fertilizer (KCl) over 20 years.

- Project NPV is estimated to be US$1.049B before tax at 8% discount rate, providing an IRR of 23.4%.

- Payback in 2 years and 11 months based on a 2-year ramp up period.

- Project operating cost places Maricunga among most efficient producers with lithium carbonate production cost of US$2,938 per tonne (/t) FOB in Chile, reducing to US$2,635/t with credits from KCl by-product.

- Project development cost estimated at US$366M (LPI’s 50% share estimated at US$183M) excluding KCl (US$23M), plus indirect costs of 14.2% (US$55M) and 18.6% (US$83M) contingency.

- The project is progressing to a feasibility study, providing improved certainty regarding reserves, metallurgical design, equipment and operational risks.

- Conventional evaporation pond and process technology to minimise operational risks.

- PEA completed by Tier-1 engineering consultancy WorleyParsons to international standards. Accuracy of operating and capital cost estimates expected within a +/- 25% range.

Lithium Power International Limited (ASX: LPI) (“LPI” or “the Company”) is pleased to provide details of the Preliminary Economic Assessment (PEA) for its Maricunga lithium brine project in northern Chile by the Maricunga joint venture company, Minera Salar Blanco (MSB).


For further information please download PDF attached:  
Download this document

Subscribe to our Daily Newsletter?

Would you like to receive our daily news to your inbox?