Media ReleasesHorizon Oil Limited

View All Horizon Oil Limited News


Horizon Oil Announces Maari Joint Venture to Complete Upgrade of FPSO Mooring System

Please find attached the media release from OMV New Zealand, operator of Horizon Oil’s Maari/Manaia field regarding the upgrade of the FPSO mooring system.
 
The work, which will “future-proof” the mooring system for the next decade, is to be carried out in late Q1/early Q2 2016 coinciding with the annual 10 day maintenance shutdown. The estimated cost of the works is approximately US$4 million, net to Horizon Oil, before insurance recoveries. As previously advised by Horizon Oil, the Company recovered US$7.4 million in insurance proceeds in respect of the swivel repairs and interim mooring line repairs in late 2013.
 
 
For further information please download PDF attached:
Download this document

Subscribe to our Daily Newsletter?

Would you like to receive our daily news to your inbox?