6H WELL HAS PERMANENT PRODUCTION EQUIPMENT INSTALLED. WAITING ON GAS PIPELINE CONSTRUCTION
8A WELL SUCCESSFULLY COMPLETED HYDRAULIC FRACTURING. PRODUCTION EQUIPMENT BEING INSTALLED. OIL REPORTED TO SURFACE DURING FRAC FLUID RECOVERY
9M WELL WAS SUCCESSFULLY COMPLETED TO A DEPTH OF 9,454 FEET. PREPARATIONS UNDER WAY FOR FRACTURE STIMULATION SCHEDULED FOR THE SECOND WEEK OF JANUARY
9E WELL HAS COMMENCED DRILLING OPERATIONS AND IS DRILLING AHEAD AT 2,992 FEET. A NEW INTERVAL WILL BE TESTED IN THIS UP DIP WELL.
Golden Gate Petroleum Ltd (ASX: GGP) is pleased to provide an update of operational activities in our Permian Basin Project located in Reagan County, Texas.